| Certification Status | Certified |
|---|---|
| ID | TL 7237 |
| Registration Name | LARSEN & TOUBRO LIMITED, L&T - CONSTRUCTION, POWER TRANSMISSION & DISTRIBUTION, OPTICAL FIBER CABLING PROJECTS |
| Company Name | LARSEN & TOUBRO LIMITED, L&T - CONSTRUCTION, POWER TRANSMISSION & DISTRIBUTION, OPTICAL FIBER CABLING PROJECTS |
| Certificate Number/Label | IND.23.17002/TL/A |
| Requirements Handbook Release | 6.3 |
| Measurements Handbook Release | R5.7 |
| Category Table Release | R5.8 |
| Date First Certified | 2020-06-19 |
| Current Certification Date | 2023-06-19 |
| Certification valid until | 2026-06-18 |
| Certification Body/Registrar | Bureau Veritas India (Private) Limited |
| Accreditation Body | ANSI National Accreditation Board (ANAB) |
| Specialty Option | V |
| Nace Code - Hardware | |
| Nace Code - Software | |
| Nace Code - Services | 71.1 |
| ISO Scope | Survey, Design, Supply, Installation, Testing and Commissioning of Optic Fiber Cable (OFC) based Network projects & related Maintenance services |
| TL 9000 Scope | Survey, Design, Supply, Installation, Testing and Commissioning of Optic Fiber Cable (OFC) based Network projects & related Maintenance services |
| Primary Contact | Suresh Balu |
|---|---|
| Alternate Contact(s) | Shripad Hegde |
| Name | LARSEN & TOUBRO LIMITED, L&T - CONSTRUCTION, POWER TRANSMISSION & DISTRIBUTION, OPTICAL FIBER CABLING PROJECTS |
|---|---|
| Address | Mountpoonamalle road Manapakam chennai Tamilnadu 600089 India Asia Pacific |
| Name | Address | City | State/Province | Zip/Postal Code | Country | Date First Certified |
|---|---|---|---|---|---|---|
| LARSEN & TOUBRO LIMITED, L&T - CONSTRUCTION, POWER TRANSMISSION & DISTRIBUTION, OPTICAL FIBER CABLING PROJECTS | Head Quarters:Mount Poonamalle Road Manapakam | Chennai | Tamil Nadu | 600089 | India | 2020-06-19 |
| Total No. of Locations = 1 | ||||||
| Category ID | Name | Date First Certified |
|---|---|---|
| 7.2.1.1 | Fixed Network | 2020-06-19 |
| Clause No | Description | Date First Certified |
|---|---|---|
| 8.3.2.HS.1 | Configuration Management Planning | 2020-06-19 |
| 8.3.2.HS.2 | Product Computing Resources | 2020-06-19 |
| 8.3.2.HS.3 | Development Process Quality Measurement | 2020-06-19 |
| 8.3.2.HS.4 | Migration Planning | 2020-06-19 |
| 8.3.4.HS.1 | Stress Testing | 2020-06-19 |
| 8.3.4.HS.2 | Abnormal Conditions | 2020-06-19 |
| 8.3.4.HS.3 | System Testing | 2020-06-19 |
| 8.3.4.HS.4 | Release Management | 2020-06-19 |
| 8.3.5.HS.1 | Product Design and Development Output | 2020-06-19 |
| 8.3.6.H.1 | Component Changes | 2020-06-19 |
| 8.5.2.H.1 | Traceability for Recall | 2020-06-19 |
| 8.5.2.H.2 | Traceability of Design Changes | 2020-06-19 |
| 8.5.4.HS.1 | Packaging and Labeling Verification | 2020-06-19 |
| 8.5.5.H.1 | Testing of Repair and Return Products | 2020-06-19 |
| 8.5.5.S.1 | Software Patching Information | 2020-06-19 |
| 8.5.1.HS.1 | Installation Instructions | 2020-06-19 |
| Category ID | Measurement List |
|---|---|
| 7.2.1.1 | SO,SONE, |